top of page
the challenge.
Digibilt was retained by the General Contractor to assist in modeling the wood framing to optimize the construction & reduce cost.
the solution.
The digital model helped the developer reduce cost and construction time because, in addition to yielding cost savings on the lumber material, many coordination conflicts were discovered that would have resulted in change orders & delays.
bottom of page